more products
News
Products
Featured Products
Contact Details
The total length 346.8 kilometers! Guangxi LNG export pipeline project officially started
13-08-2024
The project starts from Baise Station, Guangxi Province, and ends at Yanshan Station in Yunnan Province. It passes through Guangxi and Yunnan, with a total length of 346.8 kilometers, design pressure of 10 MPa, and a designed annual output of 1 billion cubic meters.
This is a plastic pipes and fittings manufacturer from China, we have the HDPE, UPVC and PPR pipes for water supply, drainage, irrigation, gas and electric cable.
Get the latest price? We'll respond as soon as possible(within 12 hours)